Mobile
Log In Sign Up
Home > chinese-english > "preliminary project" in English

English translation for "preliminary project"

初步计划
初步设计


Related Translations:
preliminary drawing:  初步设计图预拉
preliminary scheme:  初步规划初步计划
preliminary arrangement:  预先安排
preliminary assessment:  预备评估
preliminary experiment:  初步实验初步试验预备试验
preliminary review:  预备调查预审预先复查
engineering preliminaries:  工程准备工作工程准备事项
preliminary winding:  切断准备检验
Example Sentences:
1.Preliminary project feasibility study
初步的工程可行性研究
2.Preliminary project feasibility study
工程可行性初步研究
3.Preliminary project appraisal
初步工程评估
4.Preliminary project plan
初步工程计划
5.Strengthening coordination and communication of preliminary project and improving design quality
加强前期项目协调和沟通提高设计质量
6.The group is in the preliminary project planning stages of a joint venture project in shibalidian , chaoyang district , beijing , which is scheduled for completion in phases up to 2011
集团正为北京朝阳区十八里店一项合资项目进行初步规划,预计分阶段至二零一一年全部落成。
7.The group is in the preliminary project planning stages of a joint venture project in shibalidian , chaoyang district , beijing , which is scheduled for completion in phases up to 2011
集团正为北京朝阳区十八里店一项合资项目进行初步规划,预计分阶段至二零一一年全部落成。
8.The proposed landing point at the corner of the typhoon shelter is the only option according to the findings of the preliminary project feasibility study report for the project " laying of western cross harbour mains and associated land mains from west kowloon to sai ying pun "
根据敷设由西九龙至西营盘的西区海底输水管和相关陆上输水管工程可行性初步研究的结果,位于避风塘一角的拟议陆点是唯一的选址。
9.Therefore the project cost management method and application has been systematically analyzed in this paper . moreover it has compared the present situation of our project cost management with which of the international general , brought up the concept of the total cost management , established a preliminary project price information system , proposed " separation of the quantity and price " , which is bill of quantity pattern of separation of project measure consumption and project entity consumption
本文为此对工程造价管理方法及应用进行了系统分析,并将我国工程造价管理的现状与国际通行的管理模式进行比较研究,引入了全面造价管理的概念,建立了一个初步的工程价格信息系统,提出了“量价分离” 、工程实体性消耗与施工措施性消耗相分离的工程量清单计价模式。
Similar Words:
"preliminary process capability" English translation, "preliminary production" English translation, "preliminary program" English translation, "preliminary program design" English translation, "preliminary programme note" English translation, "preliminary project appraisal" English translation, "preliminary project feasibility study" English translation, "preliminary project plan" English translation, "preliminary propeller" English translation, "preliminary proposal review" English translation